Strata approval kit
Ready-to-use motion wording, common-property licence templates and resident FAQs for your AGM or committee meeting.
OC-approved, individually-metered EV charging for apartment buildings and strata schemes — designed to future-proof the whole building, not just the first mover.
Apartment EV charging is a body-corporate problem before it's an electrical problem. ESQ delivers the full strata pathway — Owners Corporation approval templates, common-property agreements, sub-metering, and dynamic load management — so a resident who wants a charger today doesn't stop the building being fully electrified tomorrow.
Ready-to-use motion wording, common-property licence templates and resident FAQs for your AGM or committee meeting.
We measure actual coincident main-switch demand to determine how many EVs the building can charge without a transformer upgrade.
Common-property cable tray and sub-board, sized for full building electrification, with per-lot spurs added as residents opt in.
Real-time main-switch monitoring throttles chargers so peak building demand is never exceeded.
Each resident is billed at their own energy tariff (plus a small OC margin) via OCPP or in-charger sub-meter.
New residents opt in and are commissioned within days — no re-engineering of the base install.
Meet with the OC / committee — walk through options and cost model.
Main-switch logging and building capacity assessment.
Resolution passed with supplied templates — common-property backbone approved.
Backbone installed, first residents commissioned, ongoing per-lot rollout.
Brisbane HQ, servicing all of Australia. 48-hour response on commercial briefs.